Optimum Production Planning Problem: A Case Study of Aspect Water Company Limited in Techiman Municipality

dc.contributor.authorAsiedu, Joseph Kofi
dc.date.accessioned2014-01-09T14:05:19Z
dc.date.accessioned2023-04-20T06:21:53Z
dc.date.available2014-01-09T14:05:19Z
dc.date.available2023-04-20T06:21:53Z
dc.date.issued2013-09
dc.descriptionThesis Submitted to the College of Science in Partial Fulfilment of the Requirements for the Degree of Msc in Industrial Mathematics at KNUST.en_US
dc.description.abstractAll production firms aim at maximizing profit after sales of their products but due to lack of technological and scientific approach in the production setting, many cannot achieve the stated objectives. This study showed the trend of production of sachet water at AWCL which gave the quantity of sachet water produced in each month for the year, 2011. The major objective of this study is to minimize the total cost of production at AWCL using Linear Programming model. The optimal solution to the production planning problem was generated by LP Solver and the demand and supply at each month were determined. The AWCL incurs cost of GH¢1.2355 when producing a bag of sachet water but with the use of linear Programming model, the cost of producing a bag of water was reduced to GH¢0.831519. The analysis also showed that, increasing the wages of regular workers and reducing that of overtime help the company to produce more with minimum cost of production. AWCL should employ more overtime labour when it is necessary to meet the urgent demands from the customers. Instead of employing more manual labour force, the company could have used machinery that can do assembling and packaging of the sachet water. Computer – based planning (scheduling) help the manufacturers to attend to orders from their respective customers easily and to enhance on – time delivery of products. The computerized planning performs better and faster than manual scheduling tools. The analysis showed that the production planning can facilitate the production processes in a way that help the company to streamline the activities that go on during acquisition of raw materials for production and the demands from the customers could be met when the wages of regular labour force are increased.en_US
dc.description.sponsorshipKNUSTen_US
dc.identifier.urihttps://ir.knust.edu.gh/handle/123456789/5499
dc.language.isoenen_US
dc.titleOptimum Production Planning Problem: A Case Study of Aspect Water Company Limited in Techiman Municipalityen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
main thesis.pdf
Size:
947.34 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.73 KB
Format:
Item-specific license agreed to upon submission
Description:
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: