Statistics for Evaluating the effects of poor scheduling in formal irrigated urban vegetable production projects in the Greater Accra region. A case study of Weija and Ashiaman irrigation schemes.
Total visits
views | |
---|---|
Evaluating the effects of poor scheduling in formal irrigated urban vegetable production projects in the Greater Accra region. A case study of Weija and Ashiaman irrigation schemes. | 41 |
Total visits per month
views | |
---|---|
November 2023 | 0 |
December 2023 | 5 |
January 2024 | 1 |
February 2024 | 1 |
March 2024 | 4 |
April 2024 | 0 |
May 2024 | 0 |
File Visits
views | |
---|---|
ERIC ASARE-BOAFO PROJECT WORK 1.pdf | 22 |