Cost performance of construction projects in Accra Metropolitan Assembly

dc.contributor.authorNyenku, Edmund Abeiku
dc.date.accessioned2015-04-16T09:38:07Z
dc.date.accessioned2023-04-20T12:24:30Z
dc.date.available2015-04-16T09:38:07Z
dc.date.available2023-04-20T12:24:30Z
dc.date.issued2015-04-16
dc.descriptionA Dissertation submitted to the Department of Building Technology in partial fulfillment of the requirements for the award of Master of Science (MSc) in Construction Managementen_US
dc.description.abstractThe Accra Metropolitan Assembly (A.M.A) is one of the local authorities in Ghana, which by statute has considerable responsibility towards providing the needed infrastructure in its area of jurisdiction. This commission can only be achieved through good coordination among both stakeholders that is the A.M.A and contractors who work in the metropolis. This research aimed at assessing cost performance of construction projects in A.M.A by identifying the key performance indicators used in measuring construction performance, identifying the causes of cost overruns and making recommendations to control cost in the construction industry. A literature review was deployed to generate a set of factors believed to affect project cost performance, which included examining other peoples work (dissertations),using the website etc. on the subject area. A total of fifty (50) structured questionnaires were distributed to contractors working on A.M.A projects. Forty Five (45) questionnaires were received from the respondents and the results were analyzed and presented using descriptive statistics and the ranking theory method. The survey findings indicate that material price fluctuation, differentiation of currency prices, high cost of machinery, inaccurate/poor estimation of original cost and incessant variation/change order were the first five factors out of the seventeen factors causing cost overruns in projects administered by A.M.A. Based on the findings, the study recommends that: 1)there should be appropriate scope definition; 2)there should be proper project costing and financing and finally; 3)contractors should use competent personnel in managing their projects.en_US
dc.description.sponsorshipKNUSTen_US
dc.identifier.urihttps://ir.knust.edu.gh/handle/123456789/7091
dc.language.isoenen_US
dc.titleCost performance of construction projects in Accra Metropolitan Assemblyen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
NYENKU Edmund Abeiku.pdf
Size:
947.45 KB
Format:
Adobe Portable Document Format
Description:
Full Thesis
License bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.73 KB
Format:
Item-specific license agreed to upon submission
Description:
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: