Constraints in Contract Claims in the Ghanaian Construction Industry: Study in the Western region.

dc.contributor.authorEssuman, Thomas Amankwatia
dc.date.accessioned2017-01-30T15:47:30Z
dc.date.accessioned2023-04-18T23:38:12Z
dc.date.available2017-01-30T15:47:30Z
dc.date.available2023-04-18T23:38:12Z
dc.date.issuedNOVEMBER 2016
dc.descriptionA Thesis Presented to the Department of Building Technology, College of Art and Built Environment, in partial fulfilment of the requirements for a degree of Master of Science, en_US
dc.description.abstractThe competitive bidding system forces contractors to price their work in a way that will give them the best opportunity to be the lowest bidder. Sometimes, too much attention is placed on getting the work and not enough attention is given to how the work can be done profitability. From the scope and objectives of the study, different test have been conducted and the procedure used for this is the quantitative method through questionnaire. This was to solicit the experience of qualified personnel on site to identify the constraints in the construction contract claims in the Ghanaian construction industry. This case study, questionnaire was developed for the contractors who are registered to the Ministry of Water Resource Works and Housing classified under financial class D1K1, D2K2. The study was limited to contractors working in the Western region. It was revealed that almost all the contractors’ questionnaire used the standard condition of contract (P.P.A) Public Procurement Authority. On the part of dispute resolution mediation was rank first with expedient and litigation last with 1.5 percent. About eighty percent (80%) always notify the clients when they identify claims by writing while less than five percent (5%) communicate to the clients through telephone communication. It was shown that contractors who purchase contract document bid for contract work or project do not study the content of the document. This has given way for some of the client to argue their way out which leads to constrain on the part of the contractor. Documentation was also one of the major problems which bring about constraint, most of the contractors do not keep proper documents of failed activities when there are variations, valuation or any type of claims. To put in justifiable claims, to avoid constraints or misunderstanding between the client and the contractor, documentation is the key. To avoid constraints in the construction contract claim documents must be prepared by competent persons. The public procurement board should come out with a standard procedure administering claims and specifying days that the client should respond to notification of claims to avoid misunderstanding and conflict on site.en_US
dc.description.sponsorshipKNUSTen_US
dc.identifier.urihttps://ir.knust.edu.gh/handle/123456789/10415
dc.language.isoenen_US
dc.titleConstraints in Contract Claims in the Ghanaian Construction Industry: Study in the Western region.en_US
dc.typeThesisen_US
Files
License bundle
Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.73 KB
Format:
Item-specific license agreed to upon submission
Description:
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description:
Loading...
Thumbnail Image
Name:
CORRECTED THESIS.1.pdf
Size:
1.15 MB
Format:
Adobe Portable Document Format
Description:
Full Thesis