A study into monitoring and evaluation on public projects: A case study of Central Tongu District

Loading...
Thumbnail Image
Date
2021-07-09
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The study aimed at examining the challenges associated with monitoring and evaluation of public funded projects using Central Tongu District as a case study. An extensive literature review was conducted which aided in the development of a structured questionnaire to be distributed to the respondents. Using the census survey sampling technique thirty-one (31) questionnaires were collected and subsequently analyzed using descriptive statistics and the Relative Importance Index (RII). The major finding for the first objective was that, the most often used monitoring technique was financial monitoring followed by physical monitoring. With the evaluation techniques, interim evaluation was ranked as the most often used followed by terminal evaluation and expost evaluation. The major findings of the objective two (2) were that, the highest ranked benefit was “they can serve as an assessment tool”. This was followed by “helps in the provision of progress report” and “assessing stakeholder performance”. The major findings of the objective three were that, the most severe challenge as indicated by the respondents was weak institutional capacity. This was followed by weak linkage between activities and limited resources and budgetary allocation for monitoring and evaluation. With these findings, it was recommended that, project managers should establish mechanisms for monitoring and evaluation for their organizations. Also, monitoring and evaluation should not be treated as a means of fulfilling requirements of project contract. However, it should be treated as a way of measuring achievements against objectives and taking corrective actions where necessary to enhance the probability of achieving project success
Description
A dissertation submitted to the Department of Construction Technology and Management, College of Art and Built Environment in partial fulfillment of the requirement for the Degree of Master of Science in Project Management.
Keywords
Monitoring, Evaluation, Challenges, Public funded projects.