Evaluation of risk factors leading to schedule and cost overrun in the delivery of public construction projects within the Metropolitan, Municipal and the District Assemblies. A study in three MMDA’s.

Loading...
Thumbnail Image
Date
2021-07-05
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Construction industry is a very important industry for the economic development of the country. However, this industry has been facing serious problems i.e. failure to complete projects within stipulated time and cost and abandoning of projects which always drain public funds to waste. This is one of the critical issues faced by the metropolitan, the municipal and the district assemblies in Ghana. Hence, the reason for evaluating the risk factors that cause schedule and cost overruns in the delivery of public sector construction works within these MMDA‟S in Ghana and to recommend measures that must be put in place to mitigate or reduce this problem. A total of 34 factors were identified from previous studies. The data collections were carried out using structured questionnaire survey. Nominal group technique was used to attach probabilities to determine the level of occurrence and severity of impact using the risk matrix. The evaluated risks were categorised into high, medium and low risks. This study found that there were 18 high risk factors and 7 medium and low risk factors. The key recommendation advanced by the research due to the agreeability of the reviewed mitigation variables are; The MMDA‟s must ensure prompt payment of any work done by the contractors; planned projects to be executed must be sizeable enough to meet the available budget allocation; The MMDA‟s must ensure that before any tendering advertisement is done, all design details are completed to enable accurate extraction of quantities and proper view of the design proposal; monitoring and evaluation of the work is important, this will enable the contractors to stay within the scope of the work and finally, contractors must not be awarded contracts based on political grounds, but their capabilities to perform the contract must be ascertained.
Description
A dissertation submitted to the Department of Construction Technology and Management, College of Art and Built Environment in partial fulfillment of the requirement for the Degree of Master of Science.
Keywords
schedule overrun, cost overrun, risk